Non-conformance report (NCR): template, example and process

What a non-conformance report (NCR) must contain, a field-by-field template, a filled-in example, disposition options and how the NCR leads to an 8D.

Written by , Head of Quality (AS/EN 9100)

Updated:

Ready immediatelyDownload at no cost
Editable filesAdapt it to your own process
Guidance includedGet practical notes on using it
DOCWord document · DOCXFree download

Non-conformance report (NCR) form

Every field from this page: identification, part and source, requirement and actual, severity, containment, disposition with approval, corrective action and closure. Editable Word file.

No signup required

A non-conformance report (NCR) records that a product, material or service did not meet its requirements: what is wrong, how many parts are affected, what happens to them, and whether a corrective action is needed. It is the first document in every quality problem; the corrective action request and the 8D report build on it.

What an NCR must contain

Field Content
NCR number and date Unique number for traceability
Detected by / where Person and stage: incoming inspection, production, final inspection, customer
Part / material Part number, name, drawing revision, lot or batch, order or delivery note
Source Supplier, internal process or customer return
Quantity Quantity inspected, quantity nonconforming
Requirement What the drawing, specification or order requires
Actual What was found, with measured values
Evidence Photos, measurement report, sample
Severity Critical, major or minor (defined in your procedure)
Containment Parts blocked, where, by whom
Disposition Decision on the nonconforming parts (see below), with approval
Corrective action required? Yes / no; if yes, reference to 8D or SCAR
Closure Date, name, verification that the disposition was carried out

Disposition options

Disposition Meaning Note
Return to supplier Parts go back for replacement or credit Usually combined with a SCAR
Rework Parts are brought into conformity by an approved process Re-inspect after rework
Repair Parts are made usable but not fully conforming Often requires customer approval
Use as is (concession) Parts are used despite the deviation In aerospace and other regulated industries, customer or design-authority approval is usually required
Scrap Parts are destroyed Make sure they cannot re-enter production

Example

NCR NCR-2026-047, 2 October
Detected Incoming inspection, inspector J. Doe
Part A-4711 housing, drawing rev. C, lot 2391, delivery note 88213
Source Supplier: machined parts supplier (example)
Quantity 50 inspected, 18 nonconforming (from a delivery of 2,000)
Requirement Bore Ø12 H7, free of burrs
Actual Burrs on the bore edge on 18 of 50 parts; diameter within tolerance
Severity Major
Containment Lot 2391 blocked in the incoming area; supplier informed to block stock
Disposition 100 % sorting by the supplier at our site; nonconforming parts returned
Corrective action Yes: SCAR-2026-031, 8D requested by 27 October
Closure Open until the 8D is accepted

From NCR to corrective action

Not every NCR needs a full root-cause analysis. Decide by severity and repetition:

  • Minor, one-off, cause obvious: correct, document, close.
  • Major, critical or repeated: request corrective action. For a supplier problem, send a SCAR and require an 8D; for an internal problem, start an internal 8D.

Supplier NCRs also feed the supplier evaluation: their number, severity and how quickly they were closed are part of the supplier’s score.

What auditors look for

ISO 9001 (clause 8.7) requires nonconforming outputs to be identified and controlled, and records of the nonconformity, the actions taken, any concessions and the authority that decided. Typical findings: no record of who approved a “use as is”, nonconforming parts not clearly segregated, and NCRs never analysed for repeat problems.

Example: severity definitions

There is no single correct definition. Severity is a matter of interpretation and differs by quality department, project and industry; what matters is that yours is written down and applied the same way every time. A common starting point:

Severity Typical definition Typical reaction
Critical Can affect safety, function or regulatory compliance; the part cannot be used; or the defect reached your customer Block stock immediately, inform the customer if affected, SCAR with 8D, containment within 24 hours
Major The part does not meet a drawing or specification requirement and cannot be used as delivered, but safety and function are not at risk; rework or sorting is needed SCAR with 8D, containment within 48 hours
Minor A deviation that does not affect fit, form or function, such as cosmetic defects or missing or incorrect documentation that can be corrected Record, correct, ask for corrective action if it repeats

In aerospace and defence, check your customer’s definitions first and align yours with them. In our scoring model, these three levels lower the supplier’s score in the affected area by 15, 8 and 3 points.

FAQ

What is the difference between an NCR and a CAR?

The NCR records the nonconformity and what happens to the affected parts. A corrective action request (CAR, or SCAR for a supplier) asks for the root cause to be found and removed so it does not happen again.

Who can approve “use as is”?

Whoever your procedure defines, usually quality together with engineering; for products to aerospace or other regulated customers, often the customer or design authority. Record the approval on the NCR.

Do I need an NCR for every defect?

For every nonconforming product that is detected, yes, at least a short record. The depth of the follow-up (none, correction, or full 8D) depends on severity and repetition.